Denex Petroleum Corporation

Denex 2004 Joint Venture

Ludie No. 1 Well
Completed Well, In Production

 

Blowing Well Back through 1" Choke
 Blowing Well Back through 1" Choke
View of Well Head from Perforating Truck
 Sand Truck Dumping Sand Into Frac Blender
 Frac Trucks Rigged Up to Frac
 8 5/8" Cement Done, Standing in 11 3/4" Casing
 8 5/8" Cement Circulating out of 11 3/4" Casing
    Note: Cement is pumped down the inside of the 8 5/8" casing to bottom of hole, where it clears the casing and comes up the back side of the casing into the 11 3/4" casing, and back to the surface, thereby sealing off any fresh water zones and coal.
 Cement Pump Truck Operators
 Derrick Hand Releasing Elevators on 8 5/8" Casing
 8 5/8 Casing being lifted up to run
 Derrick Hand Preparing to Run 8 5/8" Casing
 Derrick Hand Climbing Derrick

 
 Rolling Casing Off Rack to Run
 Rigging Up Power Tongs, etc. to Run 8 5/8" Casing
The Pit (After Top Hole)
 
 Rig Logging Top Hole, Drill Pipe & Collars Stood Back