- Building Location
|
-
|
-
|
- Digging the pit.
|
- The completed pit.
-
|
- Rigged up, drilling hole for conductor.
|
- (Note lack of substructure.)
-
|
- Float equipment for surface pipe
and production casing.
-
|
-
|
- Air compressors at back of rig.
|
|
- Lowering arm to pick up 8 5/8"
casing.
|
- Raising 8 5/8" casing.
|
- Climbing derrick to "stab"
casing.
|
|
- Man in derrick, preparing to "stab"
casing.
|
- Raising 8 5/8" casing into derrick.
|
|
- 8 5/8" casing in derrick held
by arm.
|
- Laptop monitoring 8 5/8" cement
job (wireless).
|
- 8 5/8" cement circulating, running
to pit.
|
- Logging open hole.
|
- Lifting 4 1/2" casing with arm.
|
- Raising casing into derrick.
|
- Adding joint to string.
|
- Lowering empty arm to get next joint.
|
- Installing basket on casing string.
|
- Logging cased hole.
|
- Logging cased hole.
|
- Logging cased hole.
|
- Preparing perforating guns.
|
- Denex pipelining equipment.
|
- End of well pipeline at location.
|
- Equipment on site for frac job.
|
|
|
- Blender with hoppers ready for sand.
|
- Sand trucks over blender.
|
- Other sand trucks on location, waiting
their turn.
|
- Flowing well back about 11:30 PM.
|
|
- Reclaimed Location (before seeding)
11/6/08
|
|