- Location road, leaving strip bench
|
|
The road heading to the location

|
|
The completed location, ready for the rig

|
Logging
 |
Running Production Casing
 |
Getting location ready for cement
trucks
 |
Cement Trucks on Location
 |
Brand new bulk truck (2nd job)
 |
Rigging up cementers to cement
production casing
 |
Rigging down, preparing to move
 |
The Pit
 |
Preparing to Fracture Well
 |
- Flowing Swiger #1 back after
frac
|